The level of organizational effectiveness of the (IC) construction firm, a multivariate model-based prediction methodology
Collections
Cite this version of the work
Adnan A. Adas
(1996).
The level of organizational effectiveness of the (IC) construction firm, a multivariate model-based prediction methodology. UWSpace.
http://hdl.handle.net/10012/137
Other formats