Hydrogen economy transition in Ontario – Canada considering the electricity grid constraints

dc.contributor.authorHajimiragha, Amirhossein
dc.contributor.authorFowler, Michael W.
dc.contributor.authorCañizares, Claudio A.
dc.date.accessioned2025-07-16T15:40:20Z
dc.date.available2025-07-16T15:40:20Z
dc.date.issued2009-06-02
dc.descriptionThe final publication is available at Elsevier via https://doi.org/10.1016/j.ijhydene.2009.04.063. © 2009. This manuscript version is made available under the CC-BY-NC-ND 4.0 license http://creativecommons.org/licenses/by-nc-nd/4.0/
dc.description.abstractThis paper investigates the feasibility of electrolytic hydrogen production for the transport sector during off-peak periods in Ontario. This analysis is based on the existing electricity system infrastructure and its planned future development up to 2025. First, a simplified but realistic zonal based model for Ontario's electricity transmission network is developed. Then, based on Ontario's Integrated Power System Plan (IPSP), a zonal pattern of generation capacity procurement in Ontario from 2008 to 2025 is proposed, specifying the total effective generation capacity in each zone that contributes to base-load energy. Finally, an optimization model is developed to find the optimal size of hydrogen production plants to be developed in different zones, as well as optimal hydrogen transportation routes to achieve a feasible hydrogen economy penetration in Ontario up to 2025. The proposed model is shown to be an effective planning tool for electrolysis based hydrogen economy studies. The results of the present study demonstrate that the present and projected electricity grid in Ontario can be optimally exploited for hydrogen production, achieving 1.2–2.8% levels of hydrogen economy penetration by 2025 without any additional grid or power generation investments beyond those currently planned.
dc.identifier.doi10.1016/j.ijhydene.2009.04.063
dc.identifier.issn0360-3199
dc.identifier.urihttps://doi.org/10.1016/j.ijhydene.2009.04.063
dc.identifier.urihttps://hdl.handle.net/10012/21992
dc.language.isoen
dc.publisherElsevier
dc.relation.ispartofInternational Journal of Hydrogen Energy
dc.relation.ispartofseriesInternational Journal of Hydrogen Energy; 34(13)
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internationalen
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/
dc.subjectOntario
dc.subjecthydrogen economy
dc.subjectelectricity grid
dc.subjectoptimal planning
dc.subjecttransportation
dc.titleHydrogen economy transition in Ontario – Canada considering the electricity grid constraints
dc.typeArticle
dcterms.bibliographicCitationHajimiragha, A., Fowler, M. W., & Cañizares, C. A. (2009). Hydrogen economy transition in Ontario – Canada considering the electricity grid constraints. International Journal of Hydrogen Energy, 34(13), 5275–5293. https://doi.org/10.1016/j.ijhydene.2009.04.063
oaire.citation.issue13
oaire.citation.volume34
uws.contributor.affiliation1Faculty of Engineering
uws.contributor.affiliation2Electrical and Computer Engineering
uws.peerReviewStatusReviewed
uws.scholarLevelFaculty
uws.typeOfResourceTexten

Files

Original bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
Hydrogen Economy Transition_AAM.pdf
Size:
707.2 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
4.47 KB
Format:
Item-specific license agreed upon to submission
Description: